Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Author
Runtukahu, Sherrin
Additional Author(s)
Andika D.W.
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041015/IND/2005
Subject(s)
PRODUCTION CONTROL
TIME STUDY
WORK MEASUREMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 415 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01653/06
(T) - 658.542 Run A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Perbaikan penanganan pemindahan proses packaging paku
Motion and time study design and measurement of work
Analisis persediaan spare parts di PT H.M. Sampoerna Plant Sukorejo-Pandaan
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi pajak
Performance-based earned value
Penerapan non-financial performance measurement berdasarkan konsep balanced scorecard sebagai informasi bagi manajemen dalam rangka pengukuran kinerja pada.....
Implementasi response surface method untuk mengurangi reject di pt surabaya wire (departemen paku)