Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Author
Runtukahu, Sherrin
Additional Author(s)
Andika D.W.
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041015/IND/2005
Subject(s)
PRODUCTION CONTROL
TIME STUDY
WORK MEASUREMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 415 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01653/06
(T) - 658.542 Run A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Perancangan keseimbangan lintasan untuk meningkatkan kapasitas produksi pada perusahaan meja setrika
Upaya penurunan kecacatan pada proses produksi painting line 1 PT. Astra Komponen Indonesia
Perbaikan penanganan pemindahan proses packaging paku
LKP : analisa produktivitas berdasarkan output baku pada sistem produksi PT Waradia Utama
Perancangan metode kerja pada proses penyortiran udang di PT. XYZ
Perancangan sistem perencanaan dan pengendalian produksi di CV. Olympic Makmur Jaya