Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan
Author
Setiawan, Yoppy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021679/IND/2013
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix : p. 69 - 121
. Bibliography : p. 68.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01252/13
(T) 658.542 Set P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Motion and time study design and measurement of work
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Niebel's methods, standards, and work design
Penjadwalan jobshop di CV Sinar Indah Teknik
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Motion and time study
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X