Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan
Author
Setiawan, Yoppy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021679/IND/2013
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix : p. 69 - 121
. Bibliography : p. 68.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01252/13
(T) 658.542 Set P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan produktivitas mesin R7 dengan mengurangi down time di PT Spindo
Perancangan sistem just in time untuk menurunkan lead time pada area 7 dan 8 di PT X
LKP : PT Arta Glory Buana Sidoarjo
Analisis available time pada mesin A di PT. XYZ
LKP : penjadwalan kerja di PT Surya Tedjakusuma
Pengalokasian operator pada lantai produksi PT X
Manajemen waktu untuk diri sendiri
Perbaikan fasilitas kerja divisi decal preparation di PT. Insera Sena