Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan metode kerja pada bagian pengemasan di PT. Kembang Bulan
Author
Setiawan, Yoppy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021679/IND/2013
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix : p. 69 - 121
. Bibliography : p. 68.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01252/13
(T) 658.542 Set P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Motion and time study design and measurement of work
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Perancangan fasilitas kerja pada departemen pengecatan dengan menggunakan pendekatan ergonomi guna meningkatkan produktivitas kerja di Perusahaan Eternit Hero Malang
Perencanaan produksi di PT, "X"
Manajemen waktu untuk diri sendiri
Perancangan peningkatan produktivitas pada perusahaan aluminium X
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Peningkatan kapasitas produksi pada divisi kalung lumakina kotak dengan metode line balancing dan methods time measurement di PT. Untung Bersama Sejahtera