Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Author
Chandra, Frenaldi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022062/IND?2017
Subject(s)
TIME MANAGEMENT
TIME STUDY
Notes
Appendix: p. 47-77
. Bibliography: p.46.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 77 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02819/17
(T) IND 2062
Library - 8th Floor
Available
Similar Collection
by author or subject
Penentuan waktu baku dan analisa perhitungan tenaga kerja bagian paper machine 7 PT. Suparma Tbk Surabaya
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Buku pintar manajemen waktu
Penurunan waste pada intra transportation process menggunakan value stream mapping
LKP : PT Glogarindo Surabaya
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Penurunan leadtime proses pengiriman ekspor barang dengan penggunaan value stream mapping pada divisi sales OEM di PT. X