Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan persiapan total productive maintenance pada proses produksi circuit breaker 1160 di PT E-T-A
Author
Manurung, Arifin Aucky R
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 02021435/IND/2010
Subject(s)
MANUFACTURING PROCESS
PLANT MAINTENANCE
Notes
Appendix : p. 40 - 41
Bibliography : p. 39
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 41 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00545/11
(T) 658.202 Man P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan penerapan reability centered maintenace (RCM) di PT. Kertarajasa Raya
Perancangan strategi perawatan di PT. Integra Indokabinet
Analisa keseimbangan lintasan untuk kelancaran produksi dengan menggunakan promodel di C.V. Sinar Badja Electric
Pembuatan maintenance mastership untuk peningkatan kualitas maintenance mesin-mesin produksi dan analisa penyebab cacat pada bearing after dryer force fan di PT. X
Mastering lean product development
Perencanaan penjadualan perawatan mesin di PT Soponyono
TPM implementation
Applied reliability - centered maintenance