Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Author
Sudargo, Kristianto Wibowo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021821/IND/2015
Subject(s)
MANUFACTURING PROCESS
TIME STUDY
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 76-106
. Bibliography: p. 75.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02371/15
(T) IND 1821
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa loss produk dan pengendalian kualitasdi PT Sinar Sosro
Perancangan sistem management mutu ISO 9001:2000 di PT. X
Managing business process flows
Production management
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
Upaya penurunan lembur departemen part, apparel, dan accessoris (PAA) di CV. Roda Lintas Khatulistiwa
Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia
Operations and supply management