Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu changeover dengan metode SMED di PT. Schneider Electric Manufacturing Batam-Plant Electro Mechanic
Author
Sudargo, Kristianto Wibowo
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021821/IND/2015
Subject(s)
MANUFACTURING PROCESS
TIME STUDY
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 76-106
. Bibliography: p. 75.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02371/15
(T) IND 1821
-
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran waktu istirahat untuk pengguna komputer
Pengukuran kinerja perusahaan dengan menggunakan kriteria malcolm baldrige national quality award dan usulan perbaikan di pt. bumi menara internusa
Operations management
LKP : PT Arta Glory Buana Sidoarjo
CST (color shampoo therapy)
Penentuan reward di PT Fuboru Indonesia
Pengembangan metode penjadualan job shop prosedur heuristic pendekatan non delay untuk sistem perencanaan kebutuhan material di PT Ardi Indah
Perancangan standar proses dan waktu proses pembuatan packing pada suplier PT X.