Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan red time pada perakitan circuit breaker menggunakan video analisis di PT. Schneider Electric Indonesia
Author
Onggara, Ong Nico
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021422/IND/2010
Subject(s)
PRODUCTION ENGINEERING
TIME MANAGEMENT
Notes
Appendix : p. 35 - 80
Bibliography : p. 34
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02056/10
(T) 658.542 Ong P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : CV Ardecon Surya
Manage time
Menentukan sistem perawatan mesin dengan mempertimbangkan faktor biaya di PT. X
LKP : PT Kedawung Setia Industrial Surabaya
Analisa down time produksi dan kontaminasi bahan di PT. X
The Manufacturing guides prototyping and low-volume production
LKP : PT Ometraco Arya Samanta Surabaya
Peningkatan kapasitas produksi pada SM-6 line melalui implementasi kaizen di PT Schneider Electric Indonesia LTD.