Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan perawatan mesin paku di PT. Prima Waru Industri
Author
Langi, Ian Ivan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 02022098/IND?2017
Subject(s)
INDUSTRIAL EQUIPMENT--MAINTENANCE AND REPAIR
MACHINER-MAINTENANCE AND REPAIR
PLANT MAINTENANCE
Notes
Appendix: p. 37-58
. Bibliography: p. 36.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 58 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02812/17
(T) IND 2098
Library - 8th Floor
Available
Similar Collection
by author or subject
Perencanaan penerapan reability centered maintenace (RCM) di PT. Kertarajasa Raya
Penjadwalan perawatan mesin-mesin produksi di PT. Alam Kayu Sakti
Maintenance benchmarking and best practices
Perencanaan penjadwalan perawatan mesin produksi di PT. "X"
Perencanaan perawatan mesin oil expeller kering dan persediaan suku cadang yang optimal di P.T. Sari Mas Permai
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri
Perancangan strategi maintenance yang tepat untuk mengurangi lost time pada mesin produksi PT. Kubota Indonesia
Advanced maintenance modelling for asset management