Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem aliran informasi dan barang untuk mengurangi lead time di PT X
Author
Tandiono, Yauwseph
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041367/IND/2009
Subject(s)
PRODUCTION PLANNING
TIME STUDY
Notes
Appendix : p. 117 - 149
Bibliography : p. 116
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 149 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03792/09
(T) 658.54 Tan P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan inventory bahan baku yang efisien dan tepat pada PT. X
Motion and time study
Peningkatan kualitas tape dengan menggunakan metode factorial design
Penentuan waktu standar dan rumusannya serta penerapan metode activity based costing di PT X
Manufacturing planning and control systems
Perancangan sistem perencanaan produksi dan pengendalian persediaan pada frollino pastry di Surabaya
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
LKP : PT Glogarindo Surabaya