Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Author
Lalitan, Dony
Additional Author(s)
Loanata, Vincentius R.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011576/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 62 - 69
Bibliography: p. 60 - 61
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00554/08
(T) - 658.924 Lal F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Model sistem informasi manajemen dalam pengendalian jadwal proyek
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Analisis hubungan antara tingkat tindakan tidak aman dan keefektifan pekerja pada proyek
Construction extension to the PMBOK guide third edition
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor