Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Author
Lalitan, Dony
Additional Author(s)
Loanata, Vincentius R.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011576/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 62 - 69
Bibliography: p. 60 - 61
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00554/08
(T) - 658.924 Lal F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan sistem tunggal dan sistem ganda pada bangunan terbreis eksentris berbentuk V terbalik dan diagonal pada mid rise building
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Last planner system terhadap performa proyek konstruksi
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
Analisa penggembangan produk properti berdasarkan aspek non finansial dan aspek finansial
Cara pendekatan perhitungan kuantitas pembesian pada balok struktur beton bertulang