Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Author
Lalitan, Dony
Additional Author(s)
Loanata, Vincentius R.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011576/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 62 - 69
Bibliography: p. 60 - 61
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00554/08
(T) - 658.924 Lal F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Penyiapan sarana untuk evaluasi kemajuan proyek konstruksi
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
Manajemen konstruksi
Potensi penerapan lean construction pada proyek konstruksi di Surabaya
Sebuah model penjadwalan dan pengendalian material dalam pelaksanaan proyek konstruksi
Analisa penjadwalan pekerjaan dinding pra-cetak