Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Author
Widjaya, Irwan
Additional Author(s)
Santoso, Maryanti
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011557/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 98 - 177
Bibliography: p. 97
Abstract
-
Physical Dimension
Number of Page(s)
xx, 177 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03684/07
(T) - 690.068 Wid P
-
Unavailable : Removed
Similar Collection
by author or subject
Pemodelan kriteria-kriteria pemilihan tower crane pada proyek konstruksi
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Analisa keterlambatan pada proyek bangunan gedung bertingkat di Surabaya dengan metode window delay analysis
Pengaruh faktor jenis semen dan superplasticizer tipe polycarboxylate ether terhadap sifat-sifat mortar
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Studi tentang implementasi dan pendapat kontraktor terhadap program keselamatan kerja pada proyek mall di Surabaya
Analisis faktor-faktor yang mempengaruhi kepuasan konsumen pada produk konstruksi dengan konsep construcability
Identifikasi dan peringkat kriteria-kriteria prakualifikasi konsultan perencana dan konsultan pengawas