Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Planning and monitoring design work
Author
Coles, E. J.
Additional Author(s)
Barritt, C. M. H.
Publisher
Harlow, Essex: Longman, 2000
Language
English
ISBN
0582320291
Series
-
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
BUILDING-DESIGN AND CONSTRUCTION-MANAGEMENT
Notes
Appendix: p. 180 - 186
Bibliography: p. 187 - 188. Index: p. 189 - 194
Abstract
-
Physical Dimension
Number of Page(s)
xii, 194 p.
Dimension
23 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03011/07
- 690.068 Col P
-
Unavailable : Lost
Similar Collection
by author or subject
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Studi perbandingan analisa biaya konstruksi bangunan gedung berdasarkan SNI 2002 dan BOW
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Analisis faktor-faktor yang mempengaruhi perpindahan pelaksana tetap pada perusahaan kontraktor di Surabaya
Penerapan material requirement planning pada suatu proyek konstruksi
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Analisis dampak negatif pelaksanaan pembangunan proyek terhadap lingkungan hidpu di sekitarnya