Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Strategy in working capital management under adverse economic condition: a case study of Indonesia construction smes : thesis
Author
Sanjaya, Andi
Additional Author(s)
-
Publisher
Bangkok, Thailand: Asian Institute of Technology, 2009
Language
English
ISBN
-
Series
Thesis No. CM-09-27
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-CAPITAL INVESTMENT
CONSTRUCTION INDUSTRY-CASE STUDIES
Notes
Appendix: p. 68 - 70
Bibliography: p. 65 - 66
Abstract
-
Physical Dimension
Number of Page(s)
vii, 70 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02276/10
(T2) - 690.068 San S
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi literatur tentang penataan site pada proyek konstruksi bangunan tingkat tinggi
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
CPM in construction management
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Kajian metode takt time pada proyek konstruksi
Building management by professionals
Model prediksi sukses proyek dengan kriteria-kriteria prakualifikasi kontraktor