Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa perbandingan algoritma kombinasi genetic & tabu search dengan metode ant colony pada permasalahan penjadwalan flowshop
Author
Yuanita, Fena
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011147/IND/2006
Subject(s)
PRODUCTION SCHEDULING
Notes
Appendix: p. 104 - 128
Bibliography: p. 102 - 103
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 128 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
07308/06
(T) - 658.53 Yua A
-
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan tenaga paramedis perawatan di rumah sakit katolik st. vincentius a. paulo dengan bayesian optimization algorithm
Maintenance planning and scheduling
Production planning and industrial scheduling
Penjadwalan pada permasalahan job shop dengan algoritma disjunctive programming
Aplikasi program penjadualan dan fungsi kontrol bagian PPC di PT Lestari Karya Makmur
Perbaikan penjadwalan produksi dengan mempertimbangkan keseimbangan lintasan melalui metode aggregation algorithm PT Suryaraya Nusatama
A comprehensive guide to project management schedule and cost control
Perancangan penjadualan produksi di PT Lestari Karya Makmur