Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi pakan ternak di PT Charoen Pokphand Indonesia Sepanjang
Author
Alvianto, Tommy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021747/IND/2014
Subject(s)
PRODUCTION SCHEDULING
Notes
Appendix: p. 35 - 44
. Bibliography: p. 34 .
Abstract
-
Physical Dimension
Number of Page(s)
x, 44 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02520/14
(T) IND 1747
-
Unavailable : Removed
Similar Collection
by author or subject
Kombinasi algoritma genetik & data envelopment analysis pada permasalahan penjadwalan flowshop dengan multi criteria
Perancangan dan pembuatan sistem informasi penjadwalan produksi untuk pp payne indonesia
Perencanaan bahan baku dan penjadwalan proses produksi di production training centre (PTC)
Perbaikan penjadwalan produksi dengan mempertimbangkan keseimbangan lintasan melalui metode aggregation algorithm PT Suryaraya Nusatama
Analisa perbandingan algoritma kombinasi genetic & tabu search dengan metode ant colony pada permasalahan penjadwalan flowshop
Penjadwalan pada permasalahan job shop dengan algoritma disjunctive programming
Maintenance planning and scheduling
Penjadwalan produksi di PT. Insera Sena