Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Construction scheduling with primavera project planner 2nd ed
Author
Feigenbaum, Leslie
Additional Author(s)
-
Publisher
Upper Saddle River, N.J.: 2002
Language
English
ISBN
0130922013
Series
-
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRIMAVERA PROJECT PLANNER
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 340 p.
Dimension
28 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/04
Res 690.068 Fee C
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisa perbandingan algoritma kombinasi genetic & tabu search dengan metode ant colony pada permasalahan penjadwalan flowshop
Analisis tingkat kepentingan kriteria penilaian kinerja lingkungan
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan kontraktor di Surabaya
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera