Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perbandingan algoritma heuristik hamid dan mip untuk meminimumkan makespan pada penjadualan flowshop
Author
Munika, Ika
Additional Author(s)
Palembangan, Aris
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0687/IND/2003
Subject(s)
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01150/04
(T) 658.53 Mun S
-
Unavailable : Removed
Similar Collection
by author or subject
Scheduling computer and manufacturing processes
Construction scheduling
Perancangan dan pembuatan sistem informasi penjadwalan produksi untuk pp payne indonesia
Construction project scheduling and control
Construction planning and scheduling
Scheduling theory, algorithms, and systems
Penjadwalan proyek konstruksi
Penjadwalan produksi dengan algoritma ant colony di FSCM Manufacturing Indonesia plant 4