Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan pengukuran kinerja dengan pendekatan Malcolm Baldrige National Quality Award (MBNQA) modifikasi di PT Lestari Karya Makmur Surabaya
Author
Hardiman, Irene Anggreni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041110/IND/2006
Subject(s)
PRODUCTION PLANNING
WORK MEASUREMENT
Notes
Appendix: p. 63 - 80
Bibliography: p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 80 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05794/06
(T) - 658.542 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Komunalitas part di PT Insera Sena
Peningkatan kapasitas produksi di PT Wangta Agung I
Perancangan perubahan metode pergantian dies pada departemen kawat di PT Surabaya Wire
LKP : PT Ganda Wangsa Utama
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
Perancangan 5s pada departemen paku pt. surabaya wire
Pemilihan metode lot sizing untuk perencanaan kebutuhan material di PT Gatra Mapan
Pemilihan alternatif sistem penjadualan di PT Solihin Jaya