Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Author
Soebastian, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas akhir No.03011252/IND/2007
Subject(s)
PLANNING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
Appendix: p. 59 - 70
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00949/08
(T) - 658.5038 Soe D
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem perencanaan produksi PT Daimaster
Perancangan sistem keandalan dengan Rantai Markov Kontinu
Analisis pengukuran efisiensi mesin pada proses circular di PT "X" dengan menggunakan metode data envelopment analysis
Analisis peningkatan kapasitas produksi di PT "X" dengan metode simulasi
Penentuan perencanaan produksi baki dengan metode programa linier untuk mendapatkan ongkos produksi yang minimum pada PT "X" di Surabaya
Perencanaan produksi dan pengendalian persediaan di PT. Indoasia
Perencanaan produksi perusahaan sepeda
Perancangan jadwal preventive maintenance yang optimal pada divisi blow moulding di PT X