Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Author
Soebastian, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas akhir No.03011252/IND/2007
Subject(s)
PLANNING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
Appendix: p. 59 - 70
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00949/08
(T) - 658.5038 Soe D
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Mastering lean product development
LKP : di PT Multiredjeki Kita Surabaya
Lean for dummies
Penerapan tools integrasi perencanaan produksi pada departemen production planning and inventory control PT. FSCM Manufacturing Indonesia
Perencanaan produksi perusahaan sepeda
Pemilihan metode lot sizing untuk perencanaan kebutuhan material di PT Gatra Mapan
Analisa Produktivitas di PT. Japfa Comfeed Indonesia, Tbk.
Perancangan sistem PPIC air mineral di PT. X