Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Desain tenda sementara untuk tim sar dengan menggunakan metode triz
Author
Soebastian, Johan
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas akhir No.03011252/IND/2007
Subject(s)
PLANNING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
Appendix: p. 59 - 70
Bibliography: p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 70 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00949/08
(T) - 658.5038 Soe D
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi di PT. Intipelangi Drumasindo
LKP : PT Indoplast Megah Surya Perkasa
Evaluasi efisiensi proses produksi sepatu Ardiles Kolonel di PT. Mitra Anugrah
Perancangan sistem production planing and inventory control produk air minum dalam kemasan PT Atlantic Biruraya
Production and inventory management
LKP : PT Evata Eastern jln. Suningrat no. 17 Kecamatan Taman Sidoarjo
Menentukan sistem perawatan mesin dengan mempertimbangkan faktor biaya di PT. X
Inventory management and production planning and scheduling