Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi di PT. Intipelangi Drumasindo
Author
Cintani, Suci
Additional Author(s)
Andrew, Ignatius
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0722/IND/2003
Subject(s)
INDUSTRIAL ENGINEERING
PRODUCTION ENGINEERING
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01548/04
(T) 658.5 Cin P
-
Unavailable : Removed
Similar Collection
by author or subject
Tata letak pabrik dan pemindahan bahan
LKP : PT Indoplast Megah Surya Perkasa
A disaggregate freight transport model for Germany
How to implement lean manufacturing
Perancangan sistem monitoring dan evaluasi di PT Surya Putra Barutama
Lean manufacturing that works
Pengantar teknik industri
Perancangan penjadwalan produksi dengan aplikasi excel untuk meminimumkan biaya penalti di PT. X