Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi pelaksanaan QCL Assembly di PT. XYZ dengan mempertimbangkan ketersediaan waktu dan jumlah sampel
Author
Srikuning, Jonathan Kristiadi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 02022136/IND/2018
Subject(s)
QUALITY CONTROL
TIME MANAGEMENT
Notes
Appendix: p. 83-111
. Bibliography: p. 82.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03309/18
(T) IND 02-2136
Library - 8th Floor
Available
Similar Collection
by author or subject
Customer perspective about the service in fong sheng restaurant
Introduction to relibility and quality engineering
Quest for Excellence VIII
Total quality management
Upaya pencapaian target PT X melalui penurunan persentase kecacatan
LKP: PT Inkor Bola Pacific Jln. Raya Surabaya-Malang, Ngadimulyo, Sukorejo, Pasuruan
Perbaikan sistem pengendalian kualitas pada divisi karet di PT. HRL International
Perbaikan kualitas produksi dengan metode statistical process control untuk proses produksi di PT. Sumber Rejeki