Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Author
Yanuar, Rikky
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021876/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 38-43
. Bibliography: p. 37.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 43 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01021/16
(T) IND 1876
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pemodelan kendali sistem proses regenerasi bed active carbon di pt molindo inti gas menggunakan metode fuzzy inference system
Analisis pemilihan pola produksi ekonomis untuk memenuhi rencana penjualan pada pabrik biskuit "MW" di Ujung Pandang
Matching supply with demand
Perbandingan sistem mutu oleh china quality certification (cqc) dengan iso 9001:2000 di PT E-T-A Indonesia
The improvement guide
Dampak metode penentuan kuantitas pembelian terhadap bullwhip effect dalam rantai pasok
Dasar-dasar manajemen produksi dan operasi
Perencanaan produksi dan pengendalian inventory di Jaya Metal Coating