Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan dan penerapan kanban pada produksi BG Bimetall segmen 1170 di PT. X
Author
Tombeg, Claudio Giano
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 03022087/IND/2017
Subject(s)
EFFICIENCY, INDUSTRIAL
PRODUCTION MANAGEMENT
PRODUCTION PLANNING
Notes
. Bibliography: p.51.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02852/17
(T) IND 2087
Library - 8th Floor
Available
Similar Collection
by author or subject
Manufacturing planning and control for supply chain management
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
Perancangan alat ukur penilain kinerja di PT X dengan menggunakan balanced scorecard
Perbaikan sistem pengendalian kualitas di PT. Ilufak Plaskaging
Penerapan weekly order change untuk mengurangi jangka waktu pemesanan komponen ekspor di PT Toyota Motor Manufacturing Indonesia
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Perancangan metode dan fasilitas kerja dengan pendekatan ergonomi pada Departemen SKT di PT HM Sampoerna