Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
Author
Ferandino, Jimmy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021457/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
EFFICIENCY, INDUSTRIAL
PRODUCTION CONTROL
Notes
Appendix : p. 63 - 88
Bibliography : p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xv, 88 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03849/10
(T) 658.56 Fer U
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan anggota keluarga dalam pengelolaan perusahaan keluarga (studi kasus dalam pengelolaan produksi dan operasional)
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Perancangan flexible manpower production line di PT Astra Otoparts Tbk. divisi adiwira plastik
Perancangan keseimbangan lintasan produksi pada perusahaan koper
Analisa biaya dan pengukuran kerja pada produk amplop dan box file di PT. X
Analisa produktivitas proses produksi untuk meningkatkan kapasitas produksi di departemen NCR CV Dirgahayu
Evaluasi pasca implementasi sap pada departemen PPIC PT. X
Improving production base on material planning