Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
Author
Ferandino, Jimmy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021457/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
EFFICIENCY, INDUSTRIAL
PRODUCTION CONTROL
Notes
Appendix : p. 63 - 88
Bibliography : p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xv, 88 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03849/10
(T) 658.56 Fer U
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan peningkatan kapasitas produksi mesin husker di PT Agrindo
Meminimalkan waste pada departemen secondary processing PT. X dengan menggunakan DMAIC
Implementasi theory of constraints (TOC) guna mengoptimalkan profit di PT Teja Sekawan Cocoa Industri Surabaya
Perancangan sistem PPIC di PT. Mustikarama Citraperdana
Studi kelayakan perluasan perusahaan sepatu dan topi CV. XYZ
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Perbaikan sistem pengendalian kualitas di PT. Ilufak Plaskaging
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire