Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan perbedaan hasil antara perencanaan dengan aktual produksi spin on filter di PT X
Author
Marsisca, Angela
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021433/IND/2010
Subject(s)
PRODUCTION MANAGEMENT
TIME STUDIES
Notes
Appendix : p. 59 - 89
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 89 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00546/11
(T) 658.5 Mar P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan persediaaan dan penjadualan produksi dengan tujuan meminimalkan biaya produksi menggunakan pendekatan pemrograman dinamis dan prosedur heuristic
Analisis tingkat rasio absensi dan keterlambatan terhadap pencapaian target produksi di PT Rimba Kencana, Banyuwangi
Kelayakan investasi mesin pada produksi paku di PT. Surabaya Wire
Pengelolaan dan pengembangan usaha beton pada PT. Varia Usaha Beton Waru-Sidoarjo : rencana pengembangan fungsi produksi dan operasi
Operations management
Lean performance ERP project management
Implementasi program 5S di PT Ilufak Plaskaging
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can