Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi divisi wood processing dan laminating di CV Sinar Baja Electric
Author
Gunawan, Jugo Priyo Rusdi
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2005
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01040958/IND/2005
Subject(s)
SCHEDULING
PRODUCTION MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xii, 171 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00538/06
(T) - 658.53 Gun P
-
Unavailable : Removed
Similar Collection
by author or subject
Operations management
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Penentuan kebijakan sistem produksi didasarkan atas penambahan tenaga kerja dan mesin yang optimal
How to implement lean manufacturing
Peranan material handling dalam efisiensi biaya produksi pada PT Dakar foam Utama
Making a success in manufacturing
Perancangan sistem MRP II untuk mengurangai keterlambatan delivery barang jadi di PT. Madju Warna Steel
Analisa line architecture design methodology dan peningkatan produktivitas dengan eliminasi waste di area welding departemen mcb PT Schneider Indonesia