Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Author
Wiyogo, Edmondo Aji
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021883/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 70-96
. Bibliography: p. 68-69 .
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 96 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02540/16
(T) IND 1883
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Resilience by teaming in supply chains and networks
Peningkatan rendemen barecore di PT. Anugerah Tristar International
Evaluasi penilaian 5S di area penyimpanan proyek konstruksi
Analisis efisiensi proses oleh PT. Mayunda Kartika Pratama di Sidoarjo
Analisis produktivitas kerja pada PT. Berkat Anugerah Raya
Analisa penurunan reject rate produk plastic tube di p.t. x
Scheduling
Analisa perbandingan algoritma genetika dengan algoritma scatter search pada permasalahan penjadwalan flowshop dengan kriteria minimum makespan