Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan waktu lembur pada PT. Industri Kemasan Semen Gresik
Author
Rahardjo, Tjipto
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0683/IND/2003
Subject(s)
PRODUCTION MANAGEMENT
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01159/04
(T) 658.542 Rah P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan kebutuhan material di PT. Indogarmen
Kanban for altivar/inverter production at PT Schneider Electric Manufacturing Batam
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Perancangan implementasi filosofi lean six sigma di PT Lestari Karya Makmur
Penilaian desain produk untuk tujuan perakitan
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2
LKP : PT Conbat Surabaya
LKP: PT Cipta Indah jl. Rungkut Industri III/61 Surabaya