Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengurangan waktu lembur pada PT. Industri Kemasan Semen Gresik
Author
Rahardjo, Tjipto
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0683/IND/2003
Subject(s)
PRODUCTION MANAGEMENT
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01159/04
(T) 658.542 Rah P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis kinerja tata usaha jurusan di Universitas Kristen Petra berdasarkan konsep Balanced Scorecard dengan perhitungan Data Envelopment Analysis
Brands laid bare
Pengukuran performa penelitian, publikasi, dan pengabdian pada masyarakat di fakultas dengan metode integrasi dea-ahp
Product design and development
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
LKP : PT Sumber Makmur Perkasa Surabaya
LKP : proses produksi di PT Bumi Widjaja Indah Kencana
Operation management