Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi dengan perbaikan metode kerja dan pengalokasian tenaga kerja di CV. Waru Indah
Author
Juwita, Regina Sari
Additional Author(s)
Billion, Franky Tjandra
Publisher
Surabaya: Fakultas Teknologi Industri , 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010873/IND/2004
Subject(s)
FACILITY MANAGEMENT
PRODUCTION MANAGEMENT
Notes
Appendix: p. 88 - 145
Bibliography: p. 87
Abstract
-
Physical Dimension
Number of Page(s)
xv, 145 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00494/06
(T) - 658.5 Juw P
-
Unavailable : Removed
Similar Collection
by author or subject
Mendesain ulang tata letak fasilitas PT. Friendship untuk peningkatan produksi
Perencanaan produksi berdasarkan kombinasi produk optimal pada PT August Print di Surabaya
Upaya penurunan downtime pada mesin double deck di PT X
Manajemen produksi program berita di Batu TV
Penentuan jumlah tenaga kerja yang optimal di perusahaan jangkar dengan metode linear programming
Pentingnya pengembangan produk dalam usaha meningkatkan volume penjualan pada industri kecil "xy" di Surabaya
Pengembangan metode penjadualan job shop prosedur heuristic pendekatan non delay untuk sistem perencanaan kebutuhan material di PT Ardi Indah
Perancangan desain PEFF dashboard untuk akurasi data actual working hour pada PT Toyota Motor Manufacturing Indonesia