Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Author
Winarto, Ivan Suryawan
Additional Author(s)
Kurniawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012111/SIP/2016
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 48-49 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 49 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02678/16
(T) SIP 2111
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
The scrum field guide
Information technology project management
Penggunaan linear programming dan genetic algorithms dalam menyelesaikan time-cost trade-off problem
Studi tentang project closeout pada proyek gedung T (gedung kuliah dan poliklinik) Universitas Kristen Petra
Using the project management maturity model
Project planning, scheduling, and control
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Penjadwalan proyek konstruksi