Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Author
Winarto, Ivan Suryawan
Additional Author(s)
Kurniawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012111/SIP/2016
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 48-49 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 49 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02678/16
(T) SIP 2111
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Project management
A Guide to the project management body of knowledge
Using the project management maturity model
Klasifikasi upah berdasarkan produktivitas pekerja, untuk berbagai macam pekerjaan konstruksi
Perencanaan dan pengendalian proyek PT. Triple's dalam pembangunan gedung kantor unit pelayanan PT PLN di Jatirogo
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab