Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis waktu pekerjaan finishing pada proyek apartemen
Author
Kent, Albert
Additional Author(s)
Phie, Richard Phieter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012076/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 98-111
. Bibliography: p. 97.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/16
(T) SIP 2076
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Kajian metode takt time pada proyek konstruksi
Construction methods and management
Case study of concession contract in the public private partnership
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Toekomst van de kantorenmarkt 1994-2015
Program perhitungan efektivitas penggunaan tower crane pada bangunan bertingkat
Penerapan prinsip-prinsip constructability pada proyek konstruksi di Surabaya