Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis waktu pekerjaan finishing pada proyek apartemen
Author
Kent, Albert
Additional Author(s)
Phie, Richard Phieter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012076/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 98-111
. Bibliography: p. 97.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 111 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00530/16
(T) SIP 2076
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Sustainable living
Perbandingan tingkat kepentingan dan kepuasan antara insentif finansial dan insentif non-finansial bagi staf karyawan lapangan dan kantor
Tingkat kepuasan penghuni dalam menempati apartemen sejahtera