Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan waktu baku dengan berbagai variasi produk di PT. Adicitra Bhirawa
Author
Susanti, Eni
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021857/IND/2015
Subject(s)
TIME MANAGEMENT
WORK MEASUREMENT
TIME STUDY
Notes
Appendix: p. 49-62
. Bibliography: p. 48.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 62 p.
Dimension
30 cm.
Other Desc.
-
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02349/15
(T) IND 1857
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan standar kerja untuk mengurangi lead time pengiriman dengan menggunakan metode value stream mapping di PT. Samando
Pengukuran kapasitas produksi di pt "xyz"
Perhitungan waktu baku dan analisa kebutuhan tenaga kerja departemen finishing & converting PT Suparma, Tbk
When
Penentuan reward di PT Fuboru Indonesia
Analisa standarisasi kerja operator bush forming dan pin cutting menggunakan metode tabel standar kombinasi kerja di PT. XYZ
Analisa lead time produksi dan estimasi probabiltas kedatangan material dan produk import di PT. Schering-Plough Indonesia Tbk.
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.