Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya peningkatan output produksi di PT X
Author
Setiawan, Aldo Christianto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021786/IND/2014
Subject(s)
PRODUCTION MANAGEMENT
TIME MANAGEMENT
Notes
Appendix: p. 40 - 68
. Bibliography: p. 39.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00896/15
(T) IND 1786
-
Unavailable : Removed
Similar Collection
by author or subject
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Pengendalian kualitas pada proses produksi air minum di PT Tirta Jayamas Unggul di Pandaan
Pengendalian persediaan dengan menggunakan sistem material requirements planning untuk meminimalkan persediaan bahan baku pada PT. Tunggal djaja indah
Perencanaan sistem pengendalian kualitas di PT. Surya Putra Barutama Surabaya
Topics in just-in-time management
Perancangan keseimbangan lintasan produksi di PT. XYZ
Perancangan implementasi filosofi lean six sigma di PT Lestari Karya Makmur
Sukses anda terletak pada putaran waktu