Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan resource allocation dan levelling tenaga kerja dengan menggunakan microsoft project 2010 pada suatu proyek konstruksi
Author
Yani, Victor
Additional Author(s)
Chandra W., Albert
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012008/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
Notes
Appendix: p. 45 - 84
. Bibliography: p. 44.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 84 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00548/15
(T) SIP 2008
-
Unavailable : Removed
Similar Collection
by author or subject
Uji aplikasi program CCoBML (civil construction bill of quantity, material, and labour) untuk proyek konstruksi
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Studi tentang manajemen pekerja bangunan untuk pemborong pemula di Surabaya
On time, within budget
Tingkat kepentingan faktor-faktor produktivitas pekerja konstruksi berdasarkan tingkat pengaruh dan tingkat frekuensi
Analisis kebutuhan konsumen dan rekomendasi perancangan perumahan dengan luas bangunan 36-70 m2
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko