Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan metode kerja pada proses penyortiran udang di PT. XYZ
Author
Limantara, Albert
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021714/IND/2013
Subject(s)
MOTION STUDY
TIME STUDY
Notes
Appendix: p. 27
. Bibliography: p. 26.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 42 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01421/14
(T) 658.542 Lim P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya peningkatan kapasitas produksi pada plong manual dan glueing manual di PT. X
Motion and time study for lean manufacturing
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi deinking plant (DIP) PT. Suparma Tbk.
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
LKP : analisa produktivitas berdasarkan output baku pada sistem produksi PT Waradia Utama
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Time and management
Penentuan reward di PT Fuboru Indonesia