Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Author
Darmawan, Danny
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0814/IND/2004
Subject(s)
EMPLOYEES-WORKLOAD
WORK MEASUREMENT
WORK SAMPLING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 230 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03741/04
(T) 658.54 Dar P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa pengukuran kerja dan penjadwalan di PT. E-T-E Indonesia
Analisa produktivitas tenaga kerja di pt x
Pengukuran kinerja di PT. Lotus Indah Textile Industries dengan menggunakan metode integrated performance measurement systems
LKP : mesin pengerusan garam di PT Metalco
LKP : proses produksi di PT Megasurya Mas
Perancangan produksi dan pengendalian persediaan di UD. Kompas
Panduan praktis menyusun analisis beban kerja
Pengukuran performa penelitian, publikasi, dan pengabdian pada masyarakat di fakultas dengan metode integrasi dea-ahp