Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alat bantu menggunakan metode owas dan rula untuk analisa postural stress pada pekerja PT. Omega Plastik
Author
Lesmana, Teguh
Additional Author(s)
Astrid H., Debora
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 03010847/IND/2004
Subject(s)
INDUSTRIAL ENGINEERING
WORK ENVIRONMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 154 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03711/04
(T) 658.38 Les P
-
Unavailable : Lost
Similar Collection
by author or subject
Perancangan metode dan fasilitas kerja pada bagian inspeksi akhir PT Elco Sidoarjo
Introduction to industrial and systems engineering
Pengaruh non physical work environment dan competency terhadap employee performance melalui job satisfaction di PT. Hantar Prada Harmoni
Pemberdayaan disiplin teknik industri dalam upaya mendukung perkembangan industri nasional
Lived experience of work and city rhythms
Peningkatan kapasitas produksi pada SM-6 line melalui implementasi kaizen di PT Schneider Electric Indonesia LTD.
Quantitative models for performance evaluation and benchmarking
Successful engineering management