Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Identifikasi penyebab keterlambatan pengiriman produk jadi di PT Bahari Mitra Surya dengan analisa manufacturing resource planning (MRP II)
Author
Chandra, Lydia
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010832/IND/2004
Subject(s)
INVENTORY CONTROL
PRODUCTION PLANNING
MANUFACTURING RESOURCE PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xv, 104 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02856/04
(T) 658.5038 Cha I
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Design of performance monitoring and evaluation system in Clay-Making Departments at PT Doulton Indonesia
Analisa kinerja manufacturing resource planning (MRP II) untuk produk filamen dan anchor di PT. Cahaya Angkasa Abadi
Analisa perbaikan sistem produksi dari shift 1 di PT Multicone Paperindo
Perancangan sistem aliran informasi dan barang untuk mengurangi lead time di PT X
Perancangan penjadwalan produksi dengan aplikasi excel untuk meminimumkan biaya penalti di PT. X
Perancangan produksi dan pengendalian persediaan di UD. Kompas
Perencanaan penjadualan pada departemen produksi di PT Integra Indocabinet
Perencanaan penggunaan base paper pada unit coating dan finishing machine NCR dengan menggunakan program delphi 7.0 di CV Dirgahayu