Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadualan produksi flexible flowshops dengan sequence-dependent setup times PT Cahaya Angkasa Abadi.
Author
Novianti, Hermin
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0779/IND/2004
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 109 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00517/04
(T) 658.53 Nov P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan produk
Peningkatan kapasitas produksi di PT. Intipelangi Drumasindo
Peningkatan penerapan 5S di divisi persiapan pengepakan PT X
Integrasi perencanaan produksi agregat dan perencanaan kebutuhan mesin di PT. Nusantara Plywood
Perancangan keseimbangan lintasan di PT. Eben Haezer Surakarta
Penjadwalan produksi dengan menggunakan algoritma heuristik di PT. Kappametal Surya
Analisa dan perencanaan perbaikan Produktivitas di PT. Jatim Taman Steel
Peningkatan kapasitas produksi di PT Wangta Agung I