Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan produksi untuk meminimumkan setup time dan memaksimumkan aliran uang dengan metode genetic algorithm studi kasus pada CV. WP
Author
Partana, Ivan
Additional Author(s)
Wanayulastri, Novidwina
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01011175/IND/2007
Subject(s)
PRODUCTION PLANNING
SCHEDULING (MANAGEMENT)
Notes
Appendix: p. 96 - 176
Bibliography: p. 95
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 176 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00663/07
(T) - 658.53 Par P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kualitas tape dengan menggunakan metode factorial design
Pengelolaan dan pengembangan usaha beton pada PT. Varia Usaha Beton Waru-Sidoarjo : rencana pengembangan fungsi produksi dan operasi
Techniques for construction network scheduling
Perancangan manufacturing resource planning (mrp ii) di pt filma utama soap
Sistem informasi manajemen inventori dan perencanaan produksi pada perusahaan "x"
Perencanaan bahan baku dan penjadwalan proses produksi di production training centre (PTC)
Perancangan sistem ERP di PT Mulcindo
Pengurangan setup dalam usaha pengoptimalan investasi