Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Author
Robot, Decky
Additional Author(s)
Decky Robot
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis NO. 055/MTS
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 202 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00740/03
(T2) 690.0683 Rob P
-
Unavailable : Removed
Similar Collection
by author or subject
Program T-C aktivitas proyek berdasarkan produktivitas pekerja di lapangan
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Analisis biaya elemental untuk perencanaan biaya proyek hotel
Studi aspek material konstruksi pada tahap perencanan dan pelaksanaan konstruksi
Pengaruh kinerja keuangan dan faktor makro ekonomi terhadap return saham perusahaan properti di bursa efek Jakarta
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi
Studi kasus mengenai aspek-aspek constructability pada suatu proyek apartemen
Analisis student center universitas Kristen Petra berdasarkan survai minat mahasiswa dan studi desain, dengan beberapa aspek pasar dan finansial