Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Baja Utama Danastri Surabaya
Author
Viktor T.
Additional Author(s)
Lie, We Liang
Sucipto, Jemmy
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.014
Subject(s)
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 35 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01921/99
L 621.8 Vik L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Design for x
Penilaian dan perbaikan kinerja supply chain management dan simulasi kebijakan di PT. X
Analisis produktivitas hollowframe di PT. Mulcindo
Manajemen produksi dan operasi
Pengoptimalan bahan baku untuk produksi bola dengan metode experiment design di PT. Asia Pramulia
Standarisasi berat kalung emas hollow dengan metode PDCA di PT. X
Evaluasi re-layout divisi kabel dan penerapan kaizen divisi filter di PT FSCM Manufacturing Indonesia
Perencanaan produksi dan pengendalian inventory di Jaya Metal Coating