Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Conbat Surabaya
Author
Tjia, Tjo Hui
Additional Author(s)
Agustinus
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.003
Subject(s)
ELECTRIC BATTERIES-INDUSTRY
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 38 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01919/99
L 621.8 Tji L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Penurunan tingkat kecacatan di CV Surya Mas
Perencanaan luas produksi optimal dengan metode goal programming pada PT Susanti Megah di Surabaya
Analisa pengendalian persediaan bahan baku untuk memperlancar proses produksi pada Perusahaan Tegel Dewasa di Madiun
LKP : PT Ace Metal Indonesia
Perancangan sistem perencanaan produksi di Agrindo Engineering Unit (AEU) PT Agrindo
Upaya penurunan downtime pada mesin moulding di PT. X
Operations managements
Just-in-time dalam sistem produksi toyota