Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Classic Prima Carpets Industries Surabaya
Author
Wiyono, Riawati
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I; produksi
Subject(s)
MANUFACTURING ENGINEERING
PRODUCTION PROCESSES
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
66 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03512/96
L 670.42 Wiy L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : Ratu Dept. Store dan Supermarket
Perancangan tata letak area produksi di perusahaan toples dan botol plastik
Perencanaan produksi perusahaan sepeda
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Pengukuran kinerja di PT. Lotus Indah Textile Industries dengan menggunakan metode integrated performance measurement systems
LKP : PT Ganda Wangsa Utama
Penentuan kebutuhan jumlah tenaga kerja pada departemen MPC di PT. XYZ
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim