Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Author
Hoo, Shie Lie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021639/IND/2012
Subject(s)
SCHEDULING
WORKFLOW-MANAGEMENT
Notes
Appendix : p. 39-47
Bibliography : p. 38
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 47 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04133/12
(T) 658.53 Hoo P
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh schedule flexibility terhadap turnover intention dengan kepuasan kerja karyawan sebagai variabel perantara di Surabaya Plaza Hotel
Perancangan penjadwalan produksi dengan aplikasi excel untuk meminimumkan biaya penalti di PT. X
Analisis perbandingan empat algoritma daerah sekitar untuk kasus penjadwalan
Penjadualan mesin paralel dengan metode dinamis fun (fuzzy-neuro) di PT Supra Aspindo Jaya
Penentuan temperatur optimal metode SA-MDJ dibandingkan dengan metode NEH untuk penjadualan flow shop
Penentuan rute dan penjadwalan kendaraan untuk pengiriman spon di CV. Prima Maju Jaya
LKP : PT Wijaya Indonesia Makmur Bicycle Jl. Raya Bambe Km 20 Driyorejo-Gresik
Business process management and the balanced scorecard