Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Author
Hoo, Shie Lie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021639/IND/2012
Subject(s)
SCHEDULING
WORKFLOW-MANAGEMENT
Notes
Appendix : p. 39-47
Bibliography : p. 38
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 47 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04133/12
(T) 658.53 Hoo P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis perbandingan metode penjadwalan batch multi item dengan kombinasi algoritma tabu search dan ant colony (studi kasus pada CV Sinar Baja Electric)
Analisa sistem penjadwalan produksi dengan kombinasi metode apparent tardiness cost with setups (ATCS) dan first come first serve (FCFS) pada PT. Surabaya Perdana Rotopack
Perencanaan kebutuhan bahan baku pada perusahaan meja setrika
Algoritma heuristik HFC untuk penjadwalan flowshop tanpa mempertahankan karakteristik permutation
Analisa sistem penjadwalan produksi di CV. Sinar Baja Elektric
Perencanaan dan pengendalian jadwal pekerjaan finishing proyek rumah tinggal dengan metode Activity on Node (AON)
Penerapan petri nets dalam penjadualan dan optimasi dengan simulated annealing di PT 'X'
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur