Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penjadwalan flowshop dengan mempertimbangkan batch size (studi kasus di PT X)
Author
Hoo, Shie Lie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021639/IND/2012
Subject(s)
SCHEDULING
WORKFLOW-MANAGEMENT
Notes
Appendix : p. 39-47
Bibliography : p. 38
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 47 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04133/12
(T) 658.53 Hoo P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Wijaya Indonesia Makmur Bicycle Jl. Raya Bambe Km 20 Driyorejo-Gresik
Penjadualan produksi ubin keramik single firing di PT Asia Victory Industri Ltd.
Planning and managing interior projects
Perencanaan dan pengendalian jadwal pekerjaan finishing proyek rumah tinggal dengan metode Activity on Node (AON)
Algoritma heuristik HFC untuk penjadwalan flowshop tanpa mempertahankan karakteristik permutation
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Monitoring penjadwalan proyek dan evaluasi jumlah tower crane pada proyek condominium dan podium sebuah plaza di tengah kota
Pengoptimalan rute & jadwal rutin kendaraan di PT Gunung Arta Manunggal