Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Author
Melvi, Tjiang
Additional Author(s)
Christian R. K.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011792/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xii, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03608/11
(T) 690.068 Mel S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
CPM in construction management
Sebab-sebab dan pengaruh klaim konstruksi di Surabaya
Penerapan quality function deployment dalam bidang konstruksi
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Pengukuran waktu istirahat untuk pengguna komputer
Analisis pendapat kontraktor dan pengembang yang menentukan kesuksesan perusahaan kontraktor (studi perusahaan kontraktor di Surabaya)
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera