Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Author
Melvi, Tjiang
Additional Author(s)
Christian R. K.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011792/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xii, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03608/11
(T) 690.068 Mel S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Perbaikan durasi dan pemenuhan task list aktivitas weekly cleaning pada mesin maker di PT X
Construction project scheduling and control
Perbandingan sisa material antara dinding bata konvensional dengan dinding bata ringan pada proyek perumahan
Analisa quantity take-off dengan menggunakan autodesk revit
LKP : mesin pengerusan garam di PT Metalco