Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus menganalisa waktu pekerjaan pengecoran kolom, balok, plat pada proyek Diparanu Rucitra apartemen lantai 10 dan 11
Author
Melvi, Tjiang
Additional Author(s)
Christian R. K.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011792/SIP/2011
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Bibliography : p. 44
Abstract
-
Physical Dimension
Number of Page(s)
xii, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03608/11
(T) 690.068 Mel S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi di PT Wangta Agung I
Analisis biaya dan kemungkinan investasi rumah tipe di Citra Raya dan Wisata Bukit Mas
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Construction project management
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Studi penerapan keselamatan dan kesehatan kerja (K-3) dalam penggunaan tower crane pada proyek konstruksi
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang