Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
Author
Dewabrata, Christopher O.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011608/SIP/2008
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 57 - 71
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04673/08
(T) - 658.404 Dew S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor yang mempengaruhi produktivitas pekerja dalam bidang konstruksi di Surabaya
Value engineering project report
Proyek Grand City
Perbandingan resource leveling dengan menggunakan aplikasi program microsoft project 2010 dan primavera
Pre-contract practice
Upaya penerapan source validation protocol dari forensic schedule analysis pada salah satu proyek gedung bertingkat di Surabaya
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Survei penerapan konsep sustainable construction di negara berkembang dan kemungkinan penerapannya di Indonesia