Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek
Author
Liono, Kevin Budhie
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011797/SIP/2011
Subject(s)
BUILDING-SAFETY MEASURES
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 42 - 69
Bibliography : p. 41
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03626/11
(T) 690.22 Lio P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali
Mengenal klaim konstruksi dan penyelesaian sengketa konstruksi
Survey pemanfaatan teknologi informasi pada industri konstruksi di Surabaya
Construction management of steel construction
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan tinggi
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Hubungan antara taktik dan hasil negosiasi dalam penyelesaian sengketa jasa konstruksi
Manajemen konstruksi