Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Author
Chandra, Tommy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021462/IND/2010
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 54 - 99
Bibliography : p. 53
Abstract
-
Physical Dimension
Number of Page(s)
xii, 99 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00547/11
(T) 658.5 Cha P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa yield material dan standard kerja TSKK (Tabel Standard Kerja Kombinasi) area press stamping di seksi part manufacturing departemen produksi PT. XYZ Pulogadung
Upaya mengurangi keterlambatan produksi pada PT Gajah Tunggal Prakarsa
LKP : PT Srikaya Putra Mas Sidoarjo
Funkidz rice box
Leading manufacturing excellence
Perancangan metode dan fasilitas kerja dengan pendekatan ergonomi pada Departemen SKT di PT HM Sampoerna
LKP : PT Jatim Taman Steel MFG Surabaya
Analisa peranan inovasi proses terhadap produktivitas operasional (studi kasus pada Ilo Bakery Surabaya)