Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Potensi penerapan lean construction pada proyek konstruksi di Surabaya
Author
Yapri, Victor Hosea
Additional Author(s)
Hadianto, Kevyn
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011732/SIP/2010
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 58 - 60
Bibliography : p. 53 - 57
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 60 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03171/10
(T) 690.068 Yap P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Evaluasi faktor penyebab, kuantitas, akibat dan tindakan dari sisa material pada proyek rumah tinggal
Analisis ekonomis sebagai dasar pengambilan keputusan dalam penggantian excavator
Construction extension to the PMBOK guide third edition
Studi literatur tentang penerapan metode T.R.I.Z. di bidang teknik sipil
Produktivitas pengecoran beton ready-mixed dengan concrete pump dan tower crane (Studi Kasus: Proyek Ciputra World Surabaya)
Construction management fundamentals
Faktor-faktor penghambat value management process pada tahapan konstruksi
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya