Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model bobot aktivitas sebagai dasar pendistribusian float
Author
Ongkowijoyo, Amelia
Additional Author(s)
Siswanto, Andre
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
tugas akhir No.21011672/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 59 - 61
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 61 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03420/09
(T) 690.068 Ong M
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
CPM in construction management
Project evaluation and procurement case studies
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Faktor-faktor yang mempengaruhi kinerja (performance) sumber daya manusia di tingkat menengah (mid level) manajemen pada perusahaan jasa konstruksi di Surabaya
Karakteristik pembangunan rumah burung walet dilihat dari aspek manajemen konstruksi
Penggunaan penyelesaian sengketa pada proyek konstruksi
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Legalitas redesign dan shop drawing oleh kontraktor